Tunnels du Train Fantôme
EspeleoWorld
Tunnels du Train Fantôme
A group of 18 tunnels totaling 2,665 meters, of which the longest, located up high near the Charabotte waterfall, measures 557 meters.
Plateau d'Hauteville
长度: 2665 m
最新资料
https://espeleoworld.com/zh/c/tunnels-du-train-fantome-plateau-d-hauteville
信息可能会变化。出发前请务必核对坐标、通行情况、天气和洞穴状况。
A group of 18 tunnels totaling 2,665 meters, of which the longest, located up high near the Charabotte waterfall, measures 557 meters.
描述
形态
The group comprises 18 tunnels totaling 2,665 meters. The longest is located up high, near the Charabotte waterfall, and measures 557 meters.
历史
The project dates from the 1880s; construction was decided in 1900 by the Conseil Général de l'Ain and work began in 1909. The project was contested by many Bugistes who would have preferred a line starting from Ambérieu and serving Brénod and Hauteville.
Work proceeded apace for 1 year (1910), then slowed or stopped at times, to resume properly in 1913, so that by 1914, only 7 to 8 km of track remained to be laid from Hauteville. Indeed, the supply of the worksite and therefore its progress took place via the plateau. In that same year, work stopped again, when the tunnels were almost all bored and only the bridge decks were missing.
However, in 1916, the stored rails were requisitioned by the army. In 1919, the project was relaunched. The last tunnel was then bored. From 1920 to 1932, the boring experienced numerous problems with infiltration and collapse. The trajectories of the galleries had to be modified twice. Three galleries were therefore dug.
The overload of spoil obliged the contractors to buy other land to store the materials. On this occasion, they noticed that not all the land on which the tram was built had been paid for; others, on the other hand, had been paid for twice, and others again had been paid for, but with no use for the worksite.
In 1933, the track was completed and inaugurated by the passage, over part of the section only, of a locomotive and one or two wagons occupied by the local authorities. Subsequently, it was decided to electrify the track and install heavier rails. The old rails were dismantled, but the funding for electrification was never released.
In 1936, the Conseil Général decided to abandon the line and declassify it, which would only take effect in 1951. This track never saw a train carrying passengers and was never used.
用户评论 (0)
暂无评论。
成为第一个分享体验的人!
已记录的探索 (0)
暂无探索记录。
记录您对这个洞穴的访问!
附近洞穴
包含来自 Grottocenter (Wikicaves)(grottocenter.org)的信息,依据开放数据库许可协议(Open Database License,ODbL 1.0, https://opendatacommons.org/licenses/odbl/1-0/)提供,已修改。 · https://grottocenter.org/ui/entrances/5481 · 2026年数据 · 来源:Grottocenter (Association Wikicaves), worldwide collaborative cave database(grottocenter.org),已修改。 CC BY-SA 3.0, https://creativecommons.org/licenses/by-sa/3.0/ Grottocenter (Wikicaves) · 文本作者:Vincent (Description sommaire), Vincent, Vincent (Accès depuis Tenay) · 由 Espeleoworld 改编(规范化、翻译);改编内容依据 CC BY-SA 3.0, https://creativecommons.org/licenses/by-sa/3.0/ 许可 · https://grottocenter.org/ui/entrances/5481 · 2026年数据 · 衍生数据可应要求依据 ODbL 提供: [email protected]