انتقل إلى المحتوى
١٠٠ m
الطول
٧ m
العمق
٧٩٣ m
الارتفاع

A cavity with a narrow entrance and rounded cross-section located next to the Bolumburu pit, with galleries, crawlways and joints totalling a hundred metres of development.

الخصائص

الموقع

From the rear of the village church a path carved in rock sets off towards the nearby massif, fading into some farmland, just at the lower part of the scrubland, and climbs this small hill until it cuts a wide path; ascending along it one reaches some pigeon huts, and 25 metres from the path is the Bolumburu pit, the cave being situated on the rear side of this pit.

الخريطة

المداخل

تحقق دائمًا من الإحداثيات وشروط الوصول قبل الانطلاق.

  1. Del Malo

    الارتفاع: 793 m

    42.638335, -2.212541
    UTM 30T (ED 50) 564667 4721163
تنزيل جميع المداخل بصيغة GPX

الوصف

الشكل

The Bolumburu pit has a development of a hundred metres. The entrance, of narrow dimensions and with a rounded cross-section, gives rise to an initial gallery running SW. At 11 m from its start the gallery changes appearance and is cut perpendicularly by a joint running NE. On the left side of this joint opens a crawlway of considerable width despite its low height, and at its end a new crawlway of reduced dimensions opens. Also on the left side a small vertical conduit opens, which places in two drops into a NW joint of medium amplitude with a false floor of clastic blocks; this joint ends at 8 m, cut by a perpendicular with a base of unstable blocks and a vertical at 5 m from its start. In a NE direction the gallery continues for 15 m.

الترسبات الكهفية

Along the whole route of the cavity upper chimneys are seen with large flowstone that attest to the fall of water through them.

التقدم

If one continues along the initial gallery one comes upon a crawlway 5 m long and 0.8 m high, which ends in a 2 m drop and connects with a lower joint choked by blocks at its two possible points of continuation. Returning to the crossing of the NE joint, this ends at 9 m; along its left side one continues through a crawlway of considerable width for 8 m until reaching its end, which is the entrance to a new crawlway of reduced dimensions. Through the small vertical conduit on the left side one descends 20 m, locating at -12 m a ramp platform by which one descends to that level.

التاريخ

On 19/12/1976 the Institución Príncipe de Viana and the Departamento de Obras Públicas.

تعليقات المستخدمين (0)

لا توجد تعليقات بعد.

كن أول من يشارك تجربته!

الاستكشافات المسجلة (0)

لا توجد استكشافات مسجلة بعد.

سجل زيارتك لهذا الكهف!

المصدر: Gobierno de Navarra – Catálogo espeleológico de Navarra (datosabiertos.navarra.es)، مع تعديلات. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/ Gobierno de Navarra · بيانات عام 2022